Special equipment
Lowbed, modular trailers, crane and forklift operations.
Planned transport of heavy, out-of-gauge cargo — with survey, engineering and permit management.

Transformers, production lines, generators, construction machinery… Anything beyond a standard trailer moves with route study, load engineering, special equipment (lowbed, crane) and official permits. All managed in a single project plan.
Lowbed, modular trailers, crane and forklift operations.
Out-of-gauge permits and escort organisation.
Bridge, tunnel and curve analysis for a safe corridor.
End-to-end cover at cargo value.
Measurement, weight and load analysis.
OOG permits; bridge/tunnel analysis.
Lowbed/crane plan and mobilisation.
Escorted, secured heavy haul.
Unloading and placement at destination.
Anything beyond standard trailer dimensions/weight: machinery, transformers, tanks, prefabricated structures, construction equipment.
Survey → route study and permits → equipment plan → secured loading and transport → unloading/positioning at destination.
1–4 weeks depending on country and dimensions. We bake permit lead times into the plan and give a clear schedule at quote stage.